RECENT PROJECTS
Pepsi Co Tenant Infill
This project is an 11,000sqft multi-level tenant infill. The air distribution system included the addition of (18) fan powered VAV boxes, high pressure double wall spiral duct & low pressure lined duct. The system was self-performed by Mountain Mechanical.
Owner: Pepsi Co
Architect: Sasaki
Mechanical Engineer: Cosentini
Construction Manager: Crossland Construction